new style mineral ball mill for mineral

leaching tank, electric separator products from china manufacturers - jiangxi hengchang mining machinery manufacturing co., ltd. - page 1

leaching tank, electric separator products from china manufacturers - jiangxi hengchang mining machinery manufacturing co., ltd. - page 1

Jaw Crusher, Ball Mill, Shaking Table manufacturer / supplier in China, offering High Efficient Gold Recovery Machine Alluvial and Placer Gold Mining Equipment Sand Gold Separation Recovery Plant, 1 Ton Ball Mill for Rock Gold Mining Grinding Plant 900 X 1800 Ball Mill for Gold Grinding Plant, Factory Price Grinding Process Stone Gold Ore Ball Mill Rock Stone Gold Grinder Ball Mill Grinding and so on.

ball mill operation -grinding circuit startup & shutdown procedure

ball mill operation -grinding circuit startup & shutdown procedure

After the grinding circuit has been brought up to normal operating conditions, the operator must monitor the various process variables and alarms. Most of these variables are monitored in the mill control room, however, the operator is also required to sample and analyse process streams and read local indicators.

The ball mill is susceptible to variations in ore hardness resulting in various grinds at constant throughput, or alternatively, various tonnages at constant grind. The variation in grind is not directly determined. However, a changing cyclone overflow density, at a constant tonnage rate and feed density, would be indicative of changing ore hardness and in that case the tonnage fed to the ball mill should be changed accordingly.

The ore feed rate to the ball mill is controlled by the weightometer located on the mill feed conveyor which can be manually adjusted with in the control room to give a constant weight reading. The signal from the weightometer increases or decreases the belt feeder speed and adjusts the water addition to the ball mill (as a function of the actual weight reading). Both weight control and the proportion of water can be adjusted in the control room.

The water rationing controller must be adjusted programmatically to give the desired ball mill discharge density (normally 60-65% solids). The ball mill discharge density should be checked manually at regular intervals and adjustment made to water ratio controller setpoint to adjust the ball mill discharge density.

The grinding circuit operator must ensure that the ball mill runs properly loaded and gives the correct ore grind. A major practical indication of mill loading is the sound made by the mill. A properly loaded mill will have a deep rhythmic roar, while an under loaded mill will have a metallic rattling type noise and an overloaded mill will be quite silent.

The operator must manually measure the cyclone overflow and underflow densities regularly. An increase in overflowdensity is indicative of softer ore and will soon be accompanied by a lowering of power draw at the mill and a change of sound indicating that the mill is becoming under loaded. To compensate, feed tonnage must be increased. Similarity, a decrease in the cyclone overflow density is indicative of harder ore and this will be accompanied eventually by a coking of the mill. Feed to the ball mill must be reduced.

In the event of an emergency, the mill feed conveyor is shut down individually or by stopping the operating cyclone feed pump. The ball mill must be shut down separately. All equipmentshutdowns are performed locally or from the MCC located in the mill control room.